Control Center · April 2023
EPC Works · New System Control Centers
Phnom Penh, Cambodia
Built-up area1,560 m²
Year2023
Deliverables3
Project features
Design, demolition and construction of three new control centers inside existing EDC buildings: the National Control Center (820 m²), the Distribution Control Center (325 m²) and the Backup Control Center (415 m²).
Our mission
Design & Build tender documents: General Requirements, Civil & Architectural Specifications, Design Criteria, and the Price Schedule with Preamble & Method of Measurement, plus contractual document assistance.
Scope delivered
- Price Schedule
- Specifications
- Scope of Works
PDF